The green link comprises interconnected parks and pedestrian pathways linking the neighborhood. It enhances connectivity within the
community while serving as a destination for outdoor recreation and blue-green infrastructure. Along the green link, stormwater
bioswales and a retention pond capture, filter, and drain excess water, transforming it for public benefit.
Project Credit: Celina Abba, Vicky Wang, Oliver Shi, Mengyu Zhao
The high tide and ice floes in the Bay of Fundy inspires the forms of paving detail and community landscape design. With attention to sustainability and climate change, the planning creates a unique coastal affordable housing neighborhood.
A detention pond that serves both a green infrastructure and a community amphitheater.